Les Cèdres
Work on the Petit Pouvoir footbridge
The Ministère des Transports et de la Mobilité durable will be carrying out work on the footbridge that forms part of the bicycle path located behind the Petit Pouvoir building in Les Cèdres.
Work to restore the footbridge will start during the week of June 17 and will be completed towards the end of July.
As a result, there will be a complete temporary closure of the bike path between chemin Saint-Dominique and chemin Saint-Emmanuel.
The detour will be via chemin du Fleuve. The date for reopening the bike path will be announced at a later date.
Work may be postponed or extended due to adverse weather conditions or operational constraints.
Pour partager votre opinion vous devez être connecté.