Nous joindre
X
Rechercher
Publicité
 

As of 11:59 pm

Île-aux-Tourtes bridge completely closed this weekend

durée 12h30
24 novembre 2023
ici

commentaires

ici

likes

 

vues

imprimante
Jessica Brisson
email
Par Jessica Brisson, Éditrice adjointe

Déjà vu on the Vaudreuil-Soulanges road network. The Île-aux-Tourtes bridge will be completely closed from 11:59 p.m. this Friday, until 5 a.m. on Monday November 27.

The discovery of a new seven-metre-long crack on the eastbound side of the structure last Friday has forced the Ministère de Transports et de la Mobilité durable to close the bridge completely this weekend, while the traffic lanes are reconfigured.

As a result, as of November 27, three lanes will be open on the Île-aux-Tourtes bridge, two of them in the direction of rush-hour traffic, according to the following schedule:

 - Montreal-bound: between midnight and 9:30 a.m;
- Towards Vaudreuil-Dorion: between 11:30 a.m. and 10 p.m. the following day, and every weekend 

Between 9:30 a.m. and 11:30 a.m., and between 10 p.m. and midnight, only one lane per direction will be available for the changeover.

Heavy vehicles will still be able to use the bridge, but the Ministry wishes to reiterate the importance of respecting posted loads.

At present, at least one year of work would be required before the lanes could be reopened. A precise timetable cannot be provided at this time, as the Ministry is evaluating all options for accelerating the work.

Mitigation measures 

To mitigate the impact of the complete closure during reconfiguration, tolls on Autoroute 30 will be suspended over the weekend of November 25 and 26.

Train service on the exo11 Vaudreuil-Hudson line will also be enhanced by the addition of a departure for each peak period.There will be an extra departure in the morning to Montreal, and another in the afternoon to Vaudreuil-Dorion.

Wherever possible, we recommend using public transport or telecommuting.

Road users are invited to use Highway 20, especially in the opposite direction to peak traffic, when a single lane will be open on the Île-aux-Tourtes bridge.

A follow-up will be carried out to optimize traffic light programmingpolice presence will be increased to facilitate travel on autoroute 20.

commentairesCommentaires

0

Pour partager votre opinion vous devez être connecté.

RECOMMANDÉS POUR VOUS


Publié le 13 mars 2025

MRC de Beauharnois-Salaberry : un investissement pour l'achat local

Pour une troisième année, la MRC de Beauharnois-Salaberry annonce sa participation à l’initiative ministérielle Proximité, du ministère de l’Agriculture, des Pêcheries et de l’Alimentation de Québec (MAPAQ). Elle a lancé le projet Proximité, permettant ainsi à onze entreprises du territoire de bénéficier de formations ainsi que d'un accompagnement ...

Publié le 11 mars 2025

Access to veterinary medicines in pharmacies: obstacles persist

Pet owners sometimes face high veterinary costs, especially when it comes to purchasing medication. However, an alternative exists for owners: adding their pet to the pharmaceutical file, enabling certain prescription treatments to be obtained at reduced cost from pharmacies. However, access to these medications remains limited due to regulatory ...

Publié le 10 mars 2025

A total lunar eclipse this week in Vaudreuil-Soulanges

Astronomy enthusiasts will have a short night this Thursday, March 13, when their eyes will be turned to the sky to observe a total lunar eclipse. This will take place on Thursday night. Another eclipse, this time a partial solar one, is also scheduled for Saturday March 29 across Quebec.  Philippe Moussette, president of Club Véga in Cap-Rouge, ...

app-store-badge google-play-badge